Skip to content

Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²

Villa annex of 110 m² in Al Quoz, Dubai: 2 bedrooms, 2 bathrooms, a hall and a kitchen. Design images and photos after handover. Request a quote.

Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²

Key facts

Area
110 m²
Bedrooms
2
Bathrooms
2
Kitchen
Pantry kitchen
Location
Al Quoz, Dubai
Category
Annex
Year / status
Completed · 2023
Funding
MBRHE housing grant

About this project

A villa annex of 110 square metres in Al Quoz, Dubai, built and handed over in 2023 for an owner who received a Mohammed Bin Rashid Housing Establishment grant. The project is a practical answer for a family that needs extra living space.

The annex consists of two bedrooms, a hall, a kitchen and two bathrooms. The hall offers a shared place for the family to sit, and two bathrooms are enough for the bedrooms and for guests without queues. This measured size suits a couple with one or more children, and it can equally serve as an independent home for a family member.

The project gallery contains the design images followed by photos and video clips taken after handover, so visitors can compare the drawn idea with the finished building.

Detailed construction specifications are not listed for this project, but anyone who wants a similar annex can adjust the room arrangement, the size of the hall and the shape of the kitchen, choose finishes and colours, and decide the roof type between sandwich panel and concrete. These are options the owner settles with the contractor according to the plot and the budget.

Since the project was actually built, it is a useful reference for anyone who wants a realistic picture of what can be achieved in this area, whether in arranging the rooms or in estimating a family's daily needs inside an annex.

If you are considering an annex with a similar size and layout, you are welcome to request a quote from Al Mustafa Contracting.

Facilities

  • Living hall

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top