Skip to content

Design: majlis – Jumeirah, Dubai — 45 m²

Majlis design of 45 m² in Jumeirah, Dubai, with a glass facade, a stone wall, a bathroom and wash basins. View the design images and request a quote.

Design: majlis – Jumeirah, Dubai — 45 m²

Key facts

Area
45 m²
Bathrooms
1
Location
Jumeirah, Dubai
Category
Majlis
Year / status
Design stage

About this project

This design presents a majlis in Jumeirah, Dubai, measuring 9 by 5 metres with an area of 45 m². It is a design shown in images.

The majlis consists of a seating hall with a bathroom and washbasins. These provisions make the building self-contained in use, so the host can receive guests there without them sharing the facilities of the house. The 9 by 5 metre size allows a traditional seating layout along both sides, leaving a central space for movement and serving refreshments.

The facade combines glass and stone. The glass front admits natural light and links the hall with its surroundings, while the stone wall adds a different texture and balances the transparency of the glass with a solid mass. Mixing these two materials is a familiar approach in modern majlis designs that aim to look light and grounded at once.

An owner who wants a similar majlis can change the type of stone, the interior finishing colour and the seating arrangement, and can choose the roof between sandwich panel and concrete. All of these are matters of owner preference and not specifications of this design.

We would be pleased to give you a quote for a similar majlis when you request one from Al Mustafa Contracting.

Facilities

  • Majlis
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top