Skip to content

Design: rest house, 2 bedrooms, with pool – Za’abeel, Dubai — 122 m²

Design of a 122 m² rest house in Za'abeel, Dubai, with 2 bedrooms (master and children), a prep kitchen and a pool. Request a quote for a similar project.

Design: rest house, 2 bedrooms, with pool – Za’abeel, Dubai — 122 m²

Key facts

Area
122 m²
Bedrooms
2
Kitchen
Pantry kitchen
Location
Za'abeel, Dubai
Category
Rest house
Year / status
Design stage

About this project

Rest house with pool — 122 m². Details from the project posts: area 122 m²; 2 bedroom(s); master bedroom, children bedroom and prep kitchen.

Facilities

  • Living hall
  • Swimming pool
  • Master bedroom
  • Children bedroom and prep kitchen

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top