Design: modern rest house, 1 bedroom, with pool – Hatta, Dubai
Design of a modern rest house in Hatta, Dubai: a bedroom with bathroom, a living hall with bathroom, changing room, kitchen, pool and outdoor seating.

Key facts
- Bedrooms
- 1
- Bathrooms
- 2
- Kitchen
- Pantry kitchen
- Location
- Hatta, Dubai
- Category
- Rest house
- Year / status
- Design stage
About this project
A modern rest house with a living hall and bathroom, a bedroom with its own bathroom, a changing room, a kitchen, a swimming pool and an outdoor seating area, according to the project post. The post gives no total area. The 3D render shows a white flat-roof building with large glazing beside a pool with sun loungers, and a location label on the image reads Dubai, Hatta.
Project photos
3D design
Facilities
- Living hall
- Swimming pool
- Outdoor seating
- Changing room
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app









