Design: villa annex, 1 bedroom – Al Khawaneej, Dubai — 97 m²
Design of a 97 m² villa annex with a master bedroom, living hall, bathroom and outdoor seating in Al Khawaneej, Dubai, with a flat roof and large glazing.

Key facts
- Area
- 97 m²
- Bedrooms
- 1
- Bathrooms
- 1
- Location
- Al Khawaneej, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
A 97 m² villa annex with a master bedroom, a living hall, a bathroom with washbasins and an outdoor seating area, according to the project post. The image combines a floor plan showing the seating hall, bedroom and covered open area with a 3D render of a white flat-roof building with large glazing, planting and a pergola at the entrance.
Project photos
3D design
Facilities
- Living hall
- Wash basins
- Outdoor seating
- Master bedroom
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified














