Skip to content

Design: annex or rest house, 1 bedroom – Al Bada’a, Dubai — 95 m²

Annex or rest house design of 95 m² with a master bedroom, majlis, bathroom, prep kitchen and outdoor areas in Al Bada'a, Dubai. 3D render and plan.

Design: annex or rest house, 1 bedroom – Al Bada’a, Dubai — 95 m²

Key facts

Area
95 m²
Bedrooms
1
Bathrooms
1
Kitchen
Pantry kitchen
Location
Al Bada'a, Dubai
Category
Annex
Year / status
Design stage

About this project

A 95 m² annex or rest house with a master bedroom, a spacious majlis, a bathroom with washbasins, a prep kitchen and outdoor areas, according to the project post. The single image combines a 3D front render, showing a symmetrical facade with planting and steps, and a plan view of the majlis, corridor and bedroom with the landscaped surroundings.

Facilities

  • Majlis
  • Wash basins
  • Master bedroom
  • Prep kitchen
  • Outdoor areas and landscaping

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top