Design: villa annex, 2 bedrooms, with outdoor seating – Al Mizhar, Dubai — 112 m²
Villa annex design of 112 m² with 2 bedrooms, 2 bathrooms, a hall, prep kitchen and outdoor seating in Al Mizhar, Dubai. Floor plan and 3D renders.

Key facts
- Area
- 112 m²
- Bedrooms
- 2
- Bathrooms
- 2
- Kitchen
- Pantry kitchen
- Location
- Al Mizhar, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
A 112 m² villa annex with two bedrooms, a living hall, a prep kitchen and an outdoor seating area, according to the project post. The floor plan shows two bathrooms. The gallery has the plan and day and evening 3D renders of a flat-roof facade with timber-tone cladding, large black-framed windows, a central entrance and a stepped approach.
Project photos
3D design
Facilities
- Living hall
- Outdoor seating
- Prep kitchen
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified





