Skip to content

Design: villa annex, 1 bedroom – Al Qusais, Dubai

Villa annex design in Al Qusais, Dubai, with 1 bedroom, a living area, 2 bathrooms and a prep kitchen. View the design images and request a similar quote.

Design: villa annex, 1 bedroom – Al Qusais, Dubai

Key facts

Bedrooms
1
Bathrooms
2
Kitchen
Pantry kitchen
Location
Al Qusais, Dubai
Category
Annex
Year / status
Design stage

About this project

Annex with a bedroom with a bathroom, a hall with a bathroom and washbasins and a prep kitchen, with a white and wood panel facade and large glazing, designed to the client's needs. The project posts show the design.

Facilities

  • Living hall
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top