Villa annex, 2 bedrooms — 131 m²
131 m² villa annex with 2 bedrooms, a hall, 3 bathrooms and a kitchen, plus a tiled pitched roof, pool and garden. See the design and handover photos.

Key facts
- Area
- 131 m²
- Bedrooms
- 2
- Bathrooms
- 3
- Kitchen
- Pantry kitchen
- Category
- Annex
- Year / status
- Completed
About this project
Annex of 131 m² with two bedrooms with bathrooms, a hall with a bathroom and a kitchen, with a tiled pitched roof, a pool, a garden and a kids play area. The posts show the design and the finished photos.
Project photos
3D design
Handover
Facilities
- Living hall
- Swimming pool
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified














