Design: villa annex, 3 bedrooms – Al Safa, Dubai
Villa annex design in Al Safa, Dubai: 3 bedrooms with dressing rooms, 3 bathrooms, kitchen, majlis, store and garden, beige facade. Request a quote.

Key facts
- Bedrooms
- 3
- Bathrooms
- 3
- Kitchen
- Pantry kitchen
- Location
- Al Safa, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
Annex with three bedrooms with dressing rooms, three bathrooms, a store, a kitchen, a majlis and a garden, with a beige facade in a graphico finish. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Living hall
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified








