Skip to content

Design: villa annex, 1 bedroom – Sharjah — 108 m²

Design of a 108 m² villa annex with an outer liwan in Sharjah: a bedroom, majlis, prep kitchen and two bathrooms, with a wood-fin and glass facade.

Design: villa annex, 1 bedroom – Sharjah — 108 m²

Key facts

Area
108 m²
Bedrooms
1
Bathrooms
2
Kitchen
Pantry kitchen
Location
Sharjah
Category
Annex
Year / status
Design stage

About this project

Annex of 108 m² plus an outer liwan in Sharjah, with a long facade of vertical wood fins and glass, including a bedroom, a majlis, a prep kitchen and bathrooms for the room and the hall. The project posts show the design.

Facilities

  • Majlis
  • Living hall

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top