Skip to content

Villa annex, 1 bedroom

Annex with a majlis, a bedroom with dressing room, a prep kitchen and a private pool, with a flat roof and black windows. See the design and photos.

Villa annex, 1 bedroom

Key facts

Bedrooms
1
Bathrooms
2
Kitchen
Pantry kitchen
Category
Annex
Year / status
Completed

About this project

Annex with a majlis, a bedroom with a dressing room, a prep kitchen and a private pool with blue loungers, with a flat-roof facade and black-framed windows. The project posts show the design and finished photos.

Facilities

  • Majlis
  • Swimming pool
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top