Design: annex – Nad Al Hamar, Dubai
Villa annex design in Nad Al Hamar, Dubai, with design images. Request a quote from Al Mustafa Contracting for a similar design and build project.

Key facts
- Location
- Nad Al Hamar, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
Annex in Nad Al Hamar, Dubai. Details are taken from the project posts on Instagram.
Project photos
3D design
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified






