Design: family rest house, 2 bedrooms – Abu Dhabi — 189 m²
Family rest house design of 189 m² in Abu Dhabi with two bedrooms, a kitchen, a store and a majlis. Design images and video by Al Mustafa Contracting.

Key facts
- Area
- 189 m²
- Bedrooms
- 2
- Location
- Abu Dhabi
- Category
- Rest house
- Year / status
- Design stage
About this project
Family rest house in Abu Dhabi — 189 m². Details from the project posts: area 189 m²; 2 bedroom(s); two bedrooms, kitchen, store and majlis.
Project photos
3D design
Facilities
- Majlis
- Two bedrooms
- Kitchen
- Store and majlis
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app






