Skip to content

Design: modern majlis and dining room – Mirdif, Dubai — 50 m²

Design of a modern majlis with a dining room, 50 m² (10 x 5 m), in block construction in Mirdif, Dubai, with interior design visuals.

Design: modern majlis and dining room – Mirdif, Dubai — 50 m²

Key facts

Area
50 m²
Kitchen
No kitchen
Location
Mirdif, Dubai
Category
Majlis
Construction
Conventional block
Year / status
Design stage

About this project

A modern majlis with a dining room, 50 m² in total, built in conventional block construction, according to the project post. The plan measures 10 by 5 metres and shows a dining table at one end and seating along the walls at the other. The image also shows interior design visuals of the majlis in a row of circular thumbnails.

Facilities

  • Majlis
  • Dining room

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top