Outdoor majlis – Al Juraina, Sharjah — 132 m²
Outdoor majlis of 132 m² in Al Juraina, Sharjah, with a bathroom, washbasins, a prep kitchen and outdoor seating. See handover photos and video.

Key facts
- Area
- 132 m²
- Bathrooms
- 1
- Kitchen
- Pantry kitchen
- Location
- Al Juraina, Sharjah
- Category
- Majlis
- Year / status
- Completed · 2024
- Funding
- Self-funded
About this project
A 132 m² outdoor majlis with a bathroom, washbasins, a prep kitchen and an outdoor seating area, according to the project posts. The photos from the two reels show the finished spaces: a large open majlis hall with a lit ceiling edge and curtains, and washbasin units with backlit mirrors against marble-style wall tiles.
Project photos
3D design
Handover
Facilities
- Majlis
- Wash basins
- Outdoor seating
- Bathroom
- Prep kitchen
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis26Majlis – Al Dhahir, Al Ain, Abu Dhabi — 120 m²Al Dhahir, Al Ain, Abu DhabiSome details not specified




























