Skip to content

Ready-made cafe – Al Barsha South, Dubai — 15 m²

Cafe built from a 20-foot prefab container, 15 m² plus a 15 m² roof, in Al Barsha South, Dubai, with a kitchen and serving area. See the handover photos.

Ready-made cafe – Al Barsha South, Dubai — 15 m²

Key facts

Area
15 m²
Roof area
15 m²
Kitchen
Pantry kitchen
Location
Al Barsha South, Dubai
Category
Prefab building
Construction
Prefabricated
Year / status
Completed · 2022
Funding
Self-funded

About this project

A 15 m² ready-made building with a further 15 m² roof, used as a cafe in Al Barsha South, Dubai. The interior is mainly a kitchen and serving area, with glazed walls, and an external ladder leads up to the roof. The building was made from a prefabricated 20-foot container, which suits compact commercial uses.

Facilities

  • Kitchen and serving area
  • Upper seating on the roof
  • External access ladder

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Scroll to Top