Skip to content

Design: majlis – Umm Suqeim, Dubai — 80 m²

Design of an 80 m² single-storey majlis in Umm Suqeim, Dubai, with a bathroom and washbasins; day and evening views with the floor plan. Request a quote.

Design: majlis – Umm Suqeim, Dubai — 80 m²

Key facts

Area
80 m²
Bathrooms
1
Kitchen
No kitchen
Location
Umm Suqeim, Dubai
Category
Majlis
Year / status
Design stage

About this project

An 80 m² majlis with a bathroom and washbasins, according to the project post. The floor plan shows a large seating hall with two central tables and built-in seating along the walls. The gallery has four views of a single-storey building with a flat roof and wall lights, in day and evening versions, each with the plan below.

Facilities

  • Majlis
  • Wash basins
  • Bathroom

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top