Skip to content

A smarter estimate from Al Mustafa

Plan your annex space and budget with confidence

Choose the project area, construction type, building height, rooms and services. The app turns those choices into a clear estimate you can review before speaking with our team.

⚡ Instant estimate📐 Area-based breakdown🏠 Real project references
Completed living space from an Al Mustafa annex project
Interior design and execution from a completed annex project.

01 · A clearer decision

What the app adds to your planning

Four practical tools help you compare options and prepare the requirements before you contact the construction team.

Instant estimate

See a useful cost range after selecting the area and construction type.

Clear breakdown

Separate rooms, bathrooms, kitchens, electricity and other services before setting the budget.

Practical comparison

Try different areas and specification levels to compare the options that fit your project.

Visual references

Explore completed projects with each project’s photos and videos grouped together.

02 · Five simple steps

Use the calculator in five steps

Follow the same sequence each time to make comparisons consistent and easy to review.

01

Choose the area

Enter an exact whole-number area from 20 to 500 m², or use the area slider.

02

Select construction type

Compare sandwich panel and concrete construction, then choose the specification level.

03

Set building height

Choose the height above ground in centimetres. The approximate step count appears only as a helper below the height.

04

Add rooms and bathrooms

Enter the bedroom count, bathroom count, and kitchen type with its running length.

05

Review services and totals

Include electricity, water storage, air conditioning and other selected services, then review the estimate.

03 · Before approving a budget

Factors worth reviewing

The estimate is a planning baseline. A site survey confirms the final requirements and specification.

📐 Area and layout

Plot shape, entrances, doors and windows can change structural and finishing work.

↕️ Height and levels

Ceiling height, ground elevation and access steps affect materials, insulation and entry work.

🔌 Services

Electrical points, drainage, water, cooling and kitchens each have installation requirements.

✨ Finishes

Materials, ceilings, flooring and façades determine the final specification level.

04 · Completed work

See the result before you begin

Explore completed Al Mustafa projects with photos and videos grouped by project rather than repeated posts.

05 · Quick answers

Frequently asked questions

Is the result a final price?

It is a planning estimate. The final price depends on the site survey, specification, materials and required approvals.

What does height above ground mean?

It is the building’s elevation above the surrounding ground. The app uses centimetres as the main choice and shows the approximate number of steps only as a helper.

Can I compare different areas?

Yes. Test more than one area or specification and keep the remaining choices consistent for a useful comparison.

How do I follow a visit request?

Use the request-status screen in the app after submitting your details, or contact the Al Mustafa team when you need help.

Ready to estimate your project?

Download the app, enter your choices, and review a first estimate with the Al Mustafa team.

The estimate excludes municipality fees and consultant studies unless stated otherwise.

Scroll to Top