Skip to content

Design: majlis – Al Awir, Dubai — 54 m²

Heritage majlis design of 54 m² with a sandy facade, mashrabiya panels, bathroom, prep kitchen and dining room in Al Awir, Dubai. Design images and video.

Design: majlis – Al Awir, Dubai — 54 m²

Key facts

Area
54 m²
Bathrooms
1
Kitchen
Pantry kitchen
Location
Al Awir, Dubai
Category
Majlis
Year / status
Design stage

About this project

Heritage majlis of 54 m² (11 x 4.9 m) with a sandy facade and mashrabiya panels, plus a bathroom, washbasins, a prep kitchen and a dining area. The project posts show the design.

Facilities

  • Majlis
  • Dining room
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top