Design: majlis – Nad Al Hamar, Dubai — 35 m²
Design of a 7 x 5 m majlis (35 m²) in Nad Al Hamar, Dubai, with a white facade, dark steel pergola, glass front, bathroom and washbasins. Request a quote.

Key facts
- Area
- 35 m²
- Bathrooms
- 1
- Location
- Nad Al Hamar, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis of 7 x 5 m (about 35 m²) with a white facade, a dark steel pergola and a glass front, plus a bathroom and washbasins. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified








