Skip to content

Design: majlis – Al Barsha, Dubai — 62 m²

Majlis design of 62 m² (11.55 x 5.4 m) with a natural stone facade, clay tile roof, bathroom, washbasins and a prep kitchen in Al Barsha, Dubai.

Design: majlis – Al Barsha, Dubai — 62 m²

Key facts

Area
62 m²
Bathrooms
1
Kitchen
Pantry kitchen
Location
Al Barsha, Dubai
Category
Majlis
Year / status
Design stage

About this project

Majlis of 11.55 x 5.4 m (about 62 m²) with a natural stone facade and clay tile roof, plus a bathroom, washbasins and a prep kitchen. The project posts show the design.

Facilities

  • Majlis
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top