Skip to content

Majlis – Al Dhahir, Al Ain, Abu Dhabi — 120 m²

Majlis of 120 m² in Al Dhahir, Al Ain, with a stone and wood-look slat facade, bathroom, washbasins, prep kitchen, outdoor seating. Design to handover.

Majlis – Al Dhahir, Al Ain, Abu Dhabi — 120 m²

Key facts

Area
120 m²
Bathrooms
1
Kitchen
Pantry kitchen
Location
Al Dhahir, Al Ain, Abu Dhabi
Category
Majlis
Year / status
Completed

About this project

Majlis with a stone and wood-alternative slat facade and exterior lighting, planned at about 12.4 x 6 m with an outdoor seating area, a bathroom, washbasins, a prep kitchen and gypsum board and white panel interior finishing. The project posts show the design, site photos during construction and finished photos.

Facilities

  • Majlis
  • Wash basins
  • Outdoor seating

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top