Design: majlis – Al Bada’a, Dubai
Majlis design with sandstone trim and arched windows, ladies' and gents' bathrooms, a guard room with bathroom and a prep kitchen in Al Bada'a, Dubai.

Key facts
- Bathrooms
- 3
- Kitchen
- Pantry kitchen
- Location
- Al Bada'a, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis with sandstone trim and arched-pane windows, with ladies' and gents' bathrooms, a guard room with a bathroom and a prep kitchen. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified





