Design: majlis – Al Safa, Dubai — 45 m²
Majlis design of 45 m² in Al Safa, Dubai, with a bathroom and wash basins. See the design images and video and request a quote for a similar project.

Key facts
- Area
- 45 m²
- Bathrooms
- 1
- Location
- Al Safa, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis of 9 x 5 m (45 m²) with a white flat-roof facade, large glazing and a barbecue area, plus a bathroom and washbasins. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified












