Skip to content

Design: majlis – Za’abeel, Dubai — 122 m²

Design of a 122 m² majlis in Za'abeel, Dubai with a stone and wood facade and glass sliding doors, plus outdoor seating, bathroom and prep kitchen.

Design: majlis – Za’abeel, Dubai — 122 m²

Key facts

Area
122 m²
Bathrooms
1
Kitchen
Pantry kitchen
Location
Za'abeel, Dubai
Category
Majlis
Year / status
Design stage

About this project

Majlis with a stone and wood facade and large sliding glass doors, about 12.2 x 10 m with an outdoor seating area, a bathroom, washbasins and a prep kitchen. The project posts show the design.

Facilities

  • Majlis
  • Wash basins
  • Outdoor seating

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top