Skip to content

Design: majlis – Al Manara, Dubai — 50 m²

Design of a 50 m² glass-pavilion majlis (about 10 x 5 m) with a bathroom, prep kitchen, gypsum board finishing and lighting in Al Manara, Dubai.

Design: majlis – Al Manara, Dubai — 50 m²

Key facts

Area
50 m²
Bathrooms
1
Kitchen
Pantry kitchen
Location
Al Manara, Dubai
Category
Majlis
Year / status
Design stage

About this project

Glass-pavilion majlis of about 10 x 5 m (50 m²) with a bathroom and a prep kitchen, with gypsum board finishing, lighting, insulation and warranty. The project posts show the design.

Facilities

  • Majlis

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top