Majlis, 1 bedroom – Mirdif, Dubai
Glass majlis with a stone facade, pool, bedroom with bathroom and prep kitchen in Mirdif, Dubai. See the 3D design and handover photos.

Key facts
- Bedrooms
- 1
- Bathrooms
- 2
- Kitchen
- Pantry kitchen
- Location
- Mirdif, Dubai
- Category
- Majlis
- Year / status
- Completed
About this project
Glass majlis with a stone facade and a swimming pool, plus a bathroom, a bedroom with its own bathroom and a prep kitchen. The posts show the 3D design and the finished photos.
Project photos
3D design
Handover
Facilities
- Majlis
- Swimming pool
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified






















