Skip to content

Design: majlis – Oud Al Muteena, Dubai — 58 m²

Classic majlis design of 58 m² in Oud Al Muteena, Dubai, with a bathroom and wash basins. View the design images and request a quote for a similar project.

Design: majlis – Oud Al Muteena, Dubai — 58 m²

Key facts

Area
58 m²
Bathrooms
1
Location
Oud Al Muteena, Dubai
Category
Majlis
Year / status
Design stage

About this project

Classic majlis of 58 m² with a beige facade, a bathroom, washbasins and a neo-classic interior design. The project posts show the design.

Facilities

  • Majlis
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top