Design: majlis – Warsan, Dubai — 67.5 m²
Majlis design of 67.5 m² in Warsan, Dubai, with a dining area, wash basins, a bathroom and a prep kitchen. View the design images and request a quote.

Key facts
- Area
- 67.5 m²
- Bathrooms
- 1
- Kitchen
- Pantry kitchen
- Location
- Warsan, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Family majlis of 67.5 m² with a prep kitchen, dining area, bathroom and washbasins, with a plan and interior views of the dining area, kitchen and majlis. Construction: block and column construction with an insulated sandwich panel roof. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Dining room
- Wash basins
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified










