Design: majlis and gym room – Al Mizhar, Dubai — 107 m²
Design of a 107 m² majlis with a game room (gym) and bathroom in Al Mizhar, Dubai. Request a quote for a similar project from Al Mustafa Contracting.

Key facts
- Area
- 107 m²
- Location
- Al Mizhar, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis and gym room — 107 m², Dubai. Details from the project posts: area 107 m²; majlis, game room (gym) and bathroom.
Project photos
3D design
Facilities
- Majlis
- Majlis
- Game room (gym) and bathroom
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified







