Skip to content

Design: family majlis with outdoor seating – Al Rashidiya, Dubai — 60 m²

Family majlis design with outdoor seating in Al Rashidiya, Dubai, 60 m², with a bathroom and wash basins. View the design images and request a quote.

Design: family majlis with outdoor seating – Al Rashidiya, Dubai — 60 m²

Key facts

Area
60 m²
Location
Al Rashidiya, Dubai
Category
Majlis
Year / status
Design stage

About this project

Family majlis with outdoor seating — 60 m². Details from the project posts: area 60 m²; bathroom and wash basins.

Facilities

  • Majlis
  • Wash basins
  • Outdoor seating
  • Bathroom and wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top