Skip to content

Design: majlis with bathroom, wash basins and prep kitchen – Al Rowaiyah, Dubai — 66 m²

Design of a 66 m² majlis in Al Rowaiyah, Dubai, with a bathroom, wash basins and a prep kitchen. Request a quote for a similar project from Al Mustafa.

Design: majlis with bathroom, wash basins and prep kitchen – Al Rowaiyah, Dubai — 66 m²

Key facts

Area
66 m²
Kitchen
Pantry kitchen
Location
Al Rowaiyah, Dubai
Category
Majlis
Year / status
Design stage

About this project

Majlis with bathroom, wash basins and prep kitchen — 66 m². Details from the project posts: area 66 m².

Facilities

  • Majlis
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top